FORM 6-K SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16 OF THE SECURITIES EXCHANGE ACT OF 1934 For the Quarter Ended June 30, 2007 Commission file number 001-31819 GOLD RESERVE INC. Address of Principal Executive Offices: ........................................................................926 West Sprague Avenue Suite 200 Spokane, Washington 99201 Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F. Form 20-F __ Form 40-F X . Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1): ___ Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7): ___ Indicate by check mark whether the registrant by furnishing the information contained in this Form is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934: Yes__ No X . If Yes is marked, indicate below the file number assigned to the registrant in connection with Rule 12g3-2(b): |
Forward Looking Statements |
The information presented or incorporated by reference in this Form 6-K contains both historical information and forward-looking statements (including within the meaning of Section 27A of the United States Securities Act of 1933, as amended (the "Securities Act"), and Section 21E of the United States Securities Exchange Act of 1934, as amended (the "U.S. Exchange Act"). These forward-looking statements involve risks and uncertainties, as well as assumptions that, if they never materialize, prove incorrect or materialize other than as currently contemplated, could cause our results to differ materially from those expressed or implied by such forward-looking statements.
Numerous factors could cause actual results to differ materially from those in the forward-looking statements, including without limitation, concentration of operations and assets in Venezuela; operational, regulatory, political and economic risks associated with Venezuelan operations (including changes in previously established legal regimes, rules or processes); corruption and uncertain legal enforcement; requests for improper payments; the ability to obtain or maintain the necessary permits or additional funding for the development of the Brisas Project; in the event any key findings or assumptions previously determined by the Company or the Companys consultants in conjunction with the feasibility study concerning the Brisas Project prepared in 2005 (as updated or modified from time to time) significantly differ or change as a result of actual results in the Companys expected construction and production at the Brisas Project (including capital and operating cost estimates); risk that actual mineral reserves may vary considerably from estimates presently made; impact of currency, metal prices and metal production volatility; fluctuations in energy prices; changes in proposed development plans (including technology used); the Companys dependence upon the abilities and continued participation of certain key employees; and risks normally incident to the operation and development of mining properties. This list is not exhaustive of the factors that may affect any of our forward-looking statements. See Risk factors in our Annual Information Form.
Statements concerning reserves and mineral resource estimates may also be deemed to constitute forward-looking statements to the extent that they involve estimates of the mineralization that is expected to be encountered if the property is developed, and, in the case of mineral reserves, such statements reflect the conclusion based on certain assumptions that the mineral deposit can be economically exploited.
The words "believe," "anticipate," "expect," "intend," "estimate," "plan," "assume," "positioned," "may," "could" and other similar expressions that are predictions of or indicate future events and future trends that do not relate to historical matters, identify forward-looking statements. Any such forward-looking statements are not intended to give any assurances as to future results. Investors are cautioned not to put undue reliance on forward-looking statements, and should not infer that there has been no change in the affairs of the Company since the date of this interim financial report to shareholders or any documents incorporated by reference herein that would warrant any modification of any forward-looking statement made in this document, other documents filed periodically with securities regulators or documents presented on our website. All subsequent written and oral forward-looking statements attributable to us or persons acting on our behalf are expressly qualified in their entirety by this notice. We disclaim any intent or obligation to update publicly these forward-looking statements, whether as a result of new information, future events or otherwise. Investors are urged to read our filings with Canadian and U.S. securities regulatory agencies, which can be viewed online at www.sedar.com or www.sec.gov. Additionally, investors can request a copy of any of these filings directly from our administrative office.
Exhibits |
The following are filed as exhibits to this Form 6-K: |
Exhibit | ||
Number | Description | |
|
| |
99.1 | June 30, 2007 Interim Financial Report To Shareholders | |
99.2 | Chief Executive Officers Certification of Interim Filings | |
99.3 | Chief Financial Officers Certification of Interim Filings |
SIGNATURE |
Pursuant to the requirements of the Securities Exchange Act of 1934, the Registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
GOLD RESERVE INC. |
By: | s/ Robert A. McGuinness | |
Vice President Finance & CFO | ||
August 14, 2007 |
EXHIBIT 99.1 |
June 30, 2007 Interim Financial Report To Shareholders
GOLD RESERVE INC.
June 30, 2007
Interim Financial Report to Shareholders
U.S. Dollars (unaudited) |
Page 1
Operations Overview BRISAS PROJECT |
Our Brisas gold and copper project (Brisas), is located in the Kilometre 88 mining district of the State of Bolivar in south-eastern Venezuela. Brisas is primarily comprised of a 500-hectare land parcel consisting of the Brisas alluvial concession and the Brisas hardrock concession beneath the alluvial concession. Together these concessions contain substantially all of the mineralization identified in the Brisas Report described below. Brisas also includes a number of other concessions, Corporacion Venezolana de Guayana ("CVG") work contracts and pending applications for land use authorizations and easements relating to as much as 11,000 hectares of land parcels adjacent to or near the existing alluvial and hardrock concessions.
The Brisas operating plan was approved in 2003 by the predecessor to the current Ministry of Basic Industries and Mining (the MIBAM). Approval of the Brisas operating plan was a prerequisite for submitting the Environmental and Social Impact Study for the Construction of Infrastructure and for the Exploitation and Processing of Gold and Copper Ore (ESIA) to the Ministry of Environment (MINAMB). A project bankable feasibility study (Brisas Bankable Feasibility Study) was completed in early 2005 and an updated mineral resource and reserve estimate was published in a Canadian Securities Act (CSA) National Instruments 43-101 report in late 2006.
We submitted our ESIA in July 2005 which was accepted by the MINAMB in early 2007. Acceptance of the ESIA by the MINAMB is the basis for the issuance of future permits and authorizations that we require to complete all activities including constructing the mill and exploiting the gold and copper mineralization at Brisas. In March 2007, the MINAMB issued the Authorization for the Affectation of Natural Resources for the Construction of Infrastructure and Services Phase of Brisas (the Authorization to Affect). The Authorization to Affect enables us to commence certain infrastructure work including pit dewatering, site access roads, construction of a man-camp and office complex, clearing and earthworks for the mill site, and construction of a tailings management facility footprint, sedimentation ponds, a power-line corridor, a 5.7 km conveyor belt and service road corridor, lay down areas, a rock quarry, a sanitary fill and other related mine site preparation, but does not permit us to construct the mill and exploit the gold and copper mineralization at Brisas at this time.
As a result of the issuance of the Authorization to Affect our EPCM contractor, SNC-Lavalin mobilized for the commencement of site preparation work at Brisas in June 2007. SNC-Lavalin has completed 230,000 man hours of work on Brisas in engineering, procurement and environmental activities. Orders for the water and sewage treatment plants, on-site employee housing, office facilities, and incinerator were released earlier this year. More recently the Brisas tree clearing contract was awarded. Site preparation contracts including camp water wells, pit dewatering, power generation, early civil earthworks, and road construction are expected to be released in the coming weeks. In addition, work is underway to acquire and install temporary housing, telecommunications services and various support equipment.
Also in June 2007, we placed a $64 million order for the fabrication of the Brisas gyratory crusher, pebble crushers, Semi Autogenous Grinding (SAG) and ball mills and other processing equipment from Metso Minerals. This order commenced the fabrication of a number of significant long-lead items required for the completion of Brisas and ensures our place in the fabrication schedule as lead times for SAG and ball mills continue to increase industry-wide. In addition, we finalized negotiations with Caterpillar Inc. and its local Venezuelan dealer, Venequip S.A., to provide Caterpillar haulage equipment, front end loaders and construction machinery for the construction and operation of Brisas. We initiated our alliance with Venequip by ordering 21 pieces of construction equipment, with a value of more than $10 million, to be delivered before the end of 2007. The equipment is planned to be used for early earthworks projects and to initiate construction of the tailings dam facility. Subsequent equipment deliveries, during the next three years, are expected to include approximately thirty 236 tonne capacity haulage trucks, two 18 cubic meter front end loaders, seven D10T bulldozers, and other support equipment.
The Authorization to Affect mandates a number of conditions to be met before, during and after the term of the permit. The Authorization to Affect also mandates that before commencing the permitted activities we are required to execute an Initiation Act along with representatives of the MINAMB which indicates that all conditions precedent to commencing activities have been met and documents our understanding of the obligations throughout the term of the authorization, in addition to certifying that the permitted activities can in fact commence.
We have met all conditions precedent to commencing the construction of infrastructure and services phase, although MIBAM has notified us that certain coordinates related to a small section of a new access road designed to by-pass the community of Las Claritas contained in the Authorization to Affect now conflict with several land parcels recently assigned to small miners by MIBAM. The Company along with SNC-Lavalin have re-engineered the section of the road and submitted new coordinates to MIBAM that by-pass the recently awarded land parcels. MINAMB has informed the Company it will issue the Initiation Act upon the approval of the revised road by MIBAM. We have recently received verbal approval of the revised road coordinates but are awaiting the formal response by MIBAM. Although certain work has commenced, the major activities to be performed and administered by SNC-Lavalin are being temporarily deferred until formal approval to the Company by MIBAM occurs. The Company believes that this approval will occur in the near term.
Page 2
We are ready to execute our plan to initiate our early site works in preparation of the construction of Brisas as soon as we obtain the Initiation Act from the MINAMB. We continue to focus our efforts on obtaining the on-going permits and authorizations related to Brisas, supporting SNC-Lavalins efforts to finalize detailed engineering as well as other third party consultants with various technical studies focused on optimizing the design and economics of the project. In addition, final details related to port facilities, concentrate sales contracts, electricity and fuel supply contracts, land use permits and a number of other agreements related to the construction and operation of Brisas are proceeding.
The timeline for the activities covered by the Authorization to Affect is estimated to be 14-16 months and we estimate that we will expend approximately $100 million over that time period. Overall we anticipate a minimum of 36 months to construct Brisas and, assuming we receive the required permits and authorizations, we expect commissioning and achievement of commercial production shortly thereafter.
We are dependent on Venezuelan regulatory authorities issuing to us various permits and authorizations relating to Brisas that we require prior to completing construction of, and subsequently operating, Brisas. Consistent with other mining projects of this magnitude and, in addition to permits or authorizations that must be received from the MINAMB, we need to receive a number of other permits or authorizations from various local, state and federal agencies.
To our knowledge, all of our properties are in compliance in all material respects with the appropriate regulations and requirements of the mining law and our agreements and our various social, cultural and environmental programs in the immediate and surrounding areas near Brisas are consistent with the governments social agenda including the framework of Mission Piar, one of President Chavez's social initiatives which includes the local small miners and encompasses technical assistance and training to explore and minimize the impact to the environment as well as their integration into the formal economy. We are committed to the economic and social development of Brisas in a mutually beneficial manner with the communities located near the project, the people in Bolivar State, and the Bolivarian Republic of Venezuela.
BRISAS WORK TO DATE |
Over $100 million has been expended (including costs capitalized and costs expensed in the period incurred) on Brisas since we acquired it in 1992. These costs include: property and mineral rights, acquisition costs, equipment expenditures, litigation settlement costs and extensive exploration costs including geology, geophysics and geochemistry, approximately 875 drill holes totaling over 200,000 meters of drilling, independent audits of drilling, sampling, assaying procedures and ore reserves methodology, environmental baseline work/ socioeconomic studies, hydrology studies, geotechnical studies, mine planning, advanced stage grinding and metallurgical test work, tailings dam designs, milling process flow sheet designs and a feasibility study, including a number of subsequent updates, independent CSA National Instrument 43101 reports and an ESIA.
Brisas Report |
Since the completion of the Brisas Bankable Feasibility Study in 2005, we have updated a number of the inputs and assumptions related to the development and construction of Brisas. Most significantly, we last updated our estimate of initial capital cost in April 2006 and updated the mineral resource and reserve estimate and prepared a new CSA National Instrument 43-101 report (the Brisas Report) in November 2006.
The Brisas operating plan assumes a large open pit mine containing proven and probable reserves of approximately 10.4 million ounces of gold and 1.3 billion pounds of copper in 485 million tonnes of ore grading 0.67 grams of gold per tonne and 0.13% copper, at a revenue cutoff grade of $3.04 per tonne for hard rock and $3.24 per tonne for saprolite. Mineral reserves were estimated within a final pit design based on updated economic parameters, $400 per ounce of gold and $1.15 per pound of copper. The operating plan anticipates that at full production levels, utilizing conventional truck and shovel mining methods and processing ore at 70,000 tonnes per day, Brisas would yield an average annual production of 456,000 ounces of gold and 60 million pounds of copper over an estimated mine life of approximately 18.5 years.
For purposes of economic analysis, the base case economic model utilizes an average price of $470 per ounce gold and $1.80 per pound copper based on the historical three-year rolling average for metal prices as of September 2006. At such prices, cash operating costs (net of copper credits) are estimated at $126 per ounce of gold and total costs per ounce, including operating costs and initial and sustaining capital (excluding sunk cost), are estimated to be $245 per ounce of gold.
We expect the April 2006 initial capital cost estimate of $638 million to increase 10% to 15% prior to the placement of firm orders, as a result of the passage of time, increases in the cost of raw materials and changes in supply and demand dynamics within the industry. Actual cost will not be known until firm orders are placed with suppliers in the coming months. The initial capital cost estimate excludes value added tax and import duties currently estimated at $50 million. Tax exonerations or tax recovery regimes are available for value added tax and import duty tax on the initial capital costs. The Venezuelan government has announced its intention to eliminate the VAT within three years and recently reduced the rate to 9% in July 2007. We plan to submit applications for all available exonerations and expect to obtain such exonerations prior to the construction of the project.
Page 3
MINERAL RESOURCE AND RESERVE ESTIMATE |
We updated our mineral resource and reserve estimate (summarized in the tables below) and published a CSA National Instrument 43-101 report in November 2006. The qualified persons involved in the property evaluation and resource and reserve estimate were Richard Lambert, P.E. and Richard Addison, P.E. of Pincock, Allen & Holt (PAH) and Susan Poos, P.E. of Marston & Marston Inc.
Cautionary Note to U.S. Investors. We advise U.S. investors that terms contained in CSA National Instrument 43-101 and this quarterly report differ in certain respects from those set forth in the U.S. Securities and Exchange Commission Industry Guide 7.
This quarterly report uses the terms measured, indicated and inferred resource. We advise U.S. investors that while these terms are recognized by Canadian Securities Regulators, the U.S. Securities and Exchange Commission does not recognize them. U.S. investors are cautioned not to assume that the mineralization not already categorized as mineral reserves, will ever be converted into reserves. Further, an "inferred resource" has a great amount of uncertainty as to its existence and its economic and legal feasibility. Under Canadian disclosure rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. U.S. investors are cautioned not to assume that part or all of an inferred resource exists, is economically or legally mineable or that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Also, disclosure of contained ounces is permitted under Canadian regulations however the SEC generally requires mineral resource information to be reported as in-place tonnage and grade.
MINERAL RESOURCE ESTIMATE |
The estimated measured and indicated mineral resource utilizing an off-site smelter process is summarized in the following table:
(kt=1,000 tonnes) | Measured | Indicated | Measured and Indicated | |||||||||||||||
|
|
|
|
|
|
| ||||||||||||
Au Eq | Au | Cu | Au | Cu | Au | Cu | ||||||||||||
Cut-off Grade | kt | (gpt) | (%) | kt | (gpt) | (%) | kt | (gpt) | (%) | |||||||||
|
|
|
|
|
|
|
|
|
| |||||||||
0.40 gpt | 250,565 | 0.69 | 0.12 | 323,371 | 0.64 | 0.13 | 573,936 | 0.66 | 0.13 | |||||||||
|
|
|
|
|
|
|
|
|
| |||||||||
(In Millions) | Measured | Indicated | Measured and Indicated | |||||||||||||||
|
|
|
|
|
|
| ||||||||||||
Au Eq | Au | Cu | Au | Cu | Au Cu | |||||||||||||
Cut-off Grade | oz. | lb. | oz. | lb. | oz. | lb. | ||||||||||||
|
|
|
|
|
|
|
|
|
| |||||||||
0.40 gpt | | 5.527 | 657 | | 6.621 | 927 | | 12.148 | 1,584 | |||||||||
|
|
|
|
|
|
|
|
|
|
The inferred mineral resource, based on an off-site smelter process (0.4 gram per tonne gold equivalent cut-off), is estimated at 115.0 million tonnes containing 0.590 grams gold per tonne and 0.12 percent copper, or 2.18 million ounces of gold and 294 million pounds of copper. The mineral resource and gold equivalent (AuEq) cut-off is based on $400 per gold ounce and $1.15 per pound copper.
MINERAL RESERVE ESTIMATE | ||||||||||||||||
Reserve | Au | Cu | Waste | Total | ||||||||||||
tonnes | Au Grade | Cu Grade | ounces | pounds | tonnes | tonnes | Strip | |||||||||
Class | (millions) | (gpt) | (%) | (thousands) | (millions) | (millions) | (millions) | Ratio | ||||||||
|
|
|
|
|
|
|
|
| ||||||||
Proven | 226.3 | 0.69 | 0.12 | 5,032 | 600 | |||||||||||
Probable | 258.4 | 0.64 | 0.13 | 5,357 | 737 | |||||||||||
|
|
|
|
|
|
|
|
| ||||||||
Total | 484.7 | 0.67 | 0.13 | 10,389 | 1,338 | 952.3 | 1,437.0 | 1.96 | ||||||||
|
|
|
|
|
|
|
|
|
Note that the mineral resource estimate does not represent material that exists in addition to the mineral reserve. The mineral reserve estimates disclosed above which are designated as commercially viable are included in and a part of the mineral resource estimates shown in the previous section.
The mineral reserve (within a pit design) has been estimated in using average recovery rates for gold and copper of approximately 83% and 87% respectively, metal prices of U.S. $400 per ounce gold and U.S. $1.15 per pound copper and an internal revenue cut-off of $3.04 per tonne for hard rock and $3.24 per tonne for saprolite.
CHOCO 5 PROPERTY |
The Choco 5 property (a 5,000 hectare concession) is an early stage gold exploration property located in the El Callao mining district in the State of Bolivar, southeastern Venezuela. Since acquiring the property in 2000, we have invested approximately $1.0 million on acquisition and exploration costs.
Activities on the property have included environmental permitting, geologic mapping and reconnaissance, comprehensive grid of soil geochemical sampling, geophysical testing of established gold anomalies in the eastern sector of the property as well as other identified targets, trenching and selective diamond drilling of gold anomalies, and construction of access roads to facilitate the above activities.
Page 4
During the first half of 2007, we incurred 0.1 million of exploration expense on Choco 5 including costs for the construction of 3.3 km of access roads, 42.7 km of geophysical and geochemical testing lines, completion of magnetic and radiometric geophysical ground surveys and 1034 geochemical soil and outcrop samples in a 541 hectare area, all located in the southwest sector of the property.
Drilling is planned for late August or early September 2007 and will primarily be focused in the southwest sector of the property. The first phase drilling program will include the construction of 2 km of access roads and the completion of approximately 15 diamond core holes approximating 3,000 meters. Additional drilling will continue based upon the results of this program. Our exploration activities are managed out of our office in the community of El Callao.
Page 5
Financial Overview |
Overview |
The following discussion of our financial position as of June 30, 2007 and results of operations for the three and six months ended June 30, 2007 and 2006 should be read in conjunction with our unaudited consolidated financial statements and related notes, included herein.
We prepare our consolidated financial statements in U.S. Dollars in accordance with accounting principles generally accepted in Canada. These financial statements together with the following managements discussion and analysis, dated August 14, 2007, are intended to provide investors with a reasonable basis for assessing our financial performance as well as certain forward-looking statements relating to our potential future performance. Additional information can be found at www.goldreserveinc.com, www.sedar.com or www.sec.gov.
We are engaged in the business of exploration and development of mining projects. We are presently focusing our management and financial resources on Brisas, located in Bolivar State, Venezuela. We have no commercial production at this time. As a result, we have not recorded revenue or cash flow from our mining operations and have experienced losses from operations for each of the last five years, a trend we expect to continue until Brisas is fully constructed and put into commercial production. We have historically financed our operations through the sale of common stock and other equity securities. Brisas, if constructed, is expected to be financed with equity as well as project and corporate debt.
In March 2007, the MINAMB issued the Authorization for the Affectation of Natural Resources for the Construction of Infrastructure and Services Phase of Brisas (the Authorization to Affect). The Authorization to Affect enables us to commence certain infrastructure work, including various construction activities at or near the mine site, but does not permit us to construct the mill and exploit the gold and copper mineralization at Brisas at this time. The Authorization to Affect mandates a number of conditions to be met before, during and after the term of the permit. The Authorization to Affect also mandates that before commencing the permitted activities we are required to execute an Initiation Act along with representatives of the MINAMB which indicates that all conditions precedent to commencing activities have been met and documents our understanding of the obligations throughout the term of the authorization, in addition to certifying that the permitted activities can in fact commence.
We have met all conditions precedent to commencing the construction of infrastructure and services phase, although MIBAM has notified us that certain coordinates related to a small section of a new access road designed to by-pass the community of Las Claritas contained in the Authorization to Affect conflict with several land parcels recently assigned to small miners by MIBAM. The Company along with SNC-Lavalin have re-engineered the section of the road and submitted new coordinates to MIBAM that by-pass the recently awarded land parcels. MINAMB has informed the Company it will issue the Initiation Act upon the approval of the revised road by MIBAM. We have recently received verbal approval of the revised road but are awaiting the formal response by MIBAM. Although certain work has commenced, the major activities to be performed and administered by SNC-Lavalin are being temporarily deferred until formal approval to the Company by MIBAM occurs. The Company believes that this approval will occur in the near term.
We are ready to execute our plan to initiate our early site works in preparation of the construction of Brisas as soon as we obtain the Initiation Act from the MINAMB. We continue to focus our efforts on obtaining the on-going permits and authorizations related to Brisas, supporting SNC-Lavalins efforts to finalize detailed engineering as well as other third party consultants with various technical studies focused on optimizing the design and economics of the project. In addition, final details related to port facilities, concentrate sales contracts, electricity and fuel supply contracts, land use permits and a number of other agreements related to the construction and operation of Brisas are proceeding.
In May 2007 we completed the sale of $103,500,000 aggregate principal amount of 5.50% Senior Subordinated Convertible Notes due 2022 and 13,762,300 Class A common shares at $5.80 per share (Cdn$6.42 per share) for net proceeds to the Company of approximately $173,000,000 after deducting underwriting fees and offering expenses.
We are dependent on Venezuelan regulatory authorities issuing to us various permits and authorizations relating to Brisas that we require prior to completing construction of, and subsequently operating, Brisas. Consistent with other mining projects of this magnitude and, in addition to permits or authorizations that must be received from the MINAMB, we need to receive a number of other permits or authorizations from various local, state and federal agencies.
To our knowledge, all of our properties are in compliance in all material respects with the appropriate regulations and requirements of the mining law and our agreements and our various social, cultural and environmental programs in the immediate and surrounding areas near Brisas are consistent with the governments social agenda including the framework of Mission Piar, one of President Chavez's social initiatives which includes the local small miners and encompasses technical assistance and training to explore and minimize the impact to the environment as well as their integration into the formal economy. We are committed to the economic and social development of Brisas in a mutually beneficial manner with the communities located near the project, the people in Bolivar State, and the Bolivarian Republic of Venezuela.
Page 6
The Brisas operating plan assumes a large open pit mine containing proven and probable reserves of approximately 10.4 million ounces of gold and 1.3 billion pounds of copper in 485 million tonnes of ore grading 0.67 grams of gold per tonne and 0.13% copper, at a revenue cutoff grade of $3.04 per tonne for hard rock and $3.24 per tonne for saprolite. Mineral reserves were estimated within a final pit design based on updated economic parameters, $400 per ounce of gold and $1.15 per pound of copper. The operating plan anticipates that at full production levels, utilizing conventional truck and shovel mining methods and processing ore at 70,000 tonnes per day, Brisas would yield an average annual production of 456,000 ounces of gold and 60 million pounds of copper over an estimated mine life of approximately 18.5 years.
We expect the April 2006 initial capital cost estimate of $638 million to increase 10% to 15% prior to the placement of firm orders, as a result of the passage of time, increases in the cost of raw materials and changes in supply and demand dynamics within the industry. Actual costs will not be known until firm orders are placed with suppliers in the coming months. The initial capital cost estimate excludes value added tax and import duties currently estimated at $50 million. Tax exonerations or tax recovery regimes are available for value added tax and import duty tax on the initial capital costs. Previously the Venezuelan government announced its intention to eliminate the VAT within three years, recently reducing it to 9% in July 2007. We plan to submit applications for all available exonerations and expect to obtain such exonerations prior to the construction of the project.
Venezuela has, at times, experienced high levels of inflation, political and civil unrest, government involvement in strategic industries and changes in and proposed changes in regulatory regimens during the last several years. Despite these matters, we have not curtailed our investment activities in the country. However, our operations and investments in Venezuela could be adversely affected in the future.
We believe references in this report to cash costs per ounce (a non-GAAP measure of performance) enables certain investors to better understand Brisas potential profitability and ability to generate operating cash flow. Non-GAAP measures do not have any standardized meaning prescribed by Canadian and U.S. GAAP, and therefore they may not be comparable to similar measures prescribed by other companies. The data is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP. Such measures are not necessarily indicative of operating profit or cash flow from operations as determined under GAAP.
Critical Accounting Estimates |
Critical accounting estimates represent estimates that are highly uncertain and changes in those estimates could materially impact our financial statements. The significant accounting estimates contained in the financial statements include: carrying value of Brisas; mineral reserve and resource estimates, stock-based compensation, tax calculations and contingencies. We have reviewed the development and selection of our critical accounting estimates with our Audit Committee with which they have concurred. The preparation of financial statements in conformity with generally accepted accounting principles requires us to make estimates and assumptions that affect the reported amounts of assets and liabilities, disclosure of contingent assets and liabilities at the date of the financial statements and the reported amounts of revenues and expenses during the reporting period. Actual results could differ from those estimates.
Substantially all of our investment in property, plant and equipment represents amounts invested in Brisas located in Venezuela. Our capitalization of exploration and development costs and assumptions regarding the future recoverability of such costs is subject to among other things, our current mineral reserves which are based on engineering and geological estimates, gold and copper prices, estimated plant construction and operating costs and the procurement of all necessary regulatory permits and approvals. These estimates could change in the future and this could affect the carrying value and the ultimate recoverability of the amounts recorded as property and mineral rights and capitalized exploration and development costs. See our Annual Information Form for further discussion of risk factors.
We operate and file tax returns in a number of jurisdictions. The preparation of such tax filings requires considerable judgment and the use of assumptions. Accordingly, the amounts reported could vary in the future.
Significant Accounting Policies |
Our accounting policies are described in Note 1 of the consolidated financial statements contained in our 2006 Annual Information Form with the exception of the changes described in Note 6 of the unaudited June 30, 2007 interim consolidated financial statements. The more significant accounting policies are as follows:
Financial Instruments and Comprehensive Income. Effective January 1, 2007, the Company adopted CICA Section 3855, Financial Instruments Recognition and Measurement. This section establishes standards for determining when a financial asset, financial liability or non-financial derivative is to be recognized on the balance sheet and whether it will be measured using a cost-based or fair value method. As of January 1, 2007, our investments in marketable securities have been classified as available-for-sale and are recorded at fair value on the balance sheet. Fair values are determined by reference to published price quotations in active markets and changes in these fair values are reflected in other comprehensive income and included in shareholders equity.
Page 7
We also adopted CICA section 1530, Comprehensive Income effective January 1, 2007. This section requires the presentation of a statement of comprehensive income and its components. Comprehensive income includes net income or loss and other comprehensive income. Other comprehensive income may include holding gains and losses on available-for-sale securities, gains and losses on certain derivative instruments and foreign currency gains and losses from self sustaining foreign operations.
Stock Based Compensation. We use the fair value method of accounting for stock options granted to employees and directors. Consideration paid for shares on exercise of share options in addition to the fair value attributable to stock options granted is credited to capital stock.
Exploration and Development Costs. Exploration costs incurred in locating areas of potential mineralization are expensed as incurred. Exploration costs of properties or working interests with specific areas of potential mineralization are capitalized at cost pending the determination of a propertys economic viability. Development costs of proven mining properties not yet producing are capitalized at cost and classified as property, plant and equipment. Property holding costs are charged to operations during the period if no significant exploration or development activities are being conducted on the related properties. Upon commencement of production, capitalized exploration and development costs will be amortized based on the estimated proven and probable reserves benefited. Properties which are abandoned are written-off and properties determined to be impaired are written-down to the estimated fair value. Interest expense allocable to the cost of developing mining properties and to constructing new facilities is capitalized until assets are ready for their intended use.
Results of Operations |
Our results of operation are a product of operating expenses, primarily related to the development of Brisas, net of investment income. Consolidated net loss for the three and six months ended June 30, 2007 amounted to ($1.3) million and ($4.1) million or ($0.03) and ($0.09) per share compared to consolidated net income (loss) of ($1.7) million and $0.6 million or ($0.05) and $0.02 per share, respectively, for the same periods in 2006.
Other income for the three month period ended June 30, 2007 increased by $1.0 million over the comparable period in 2006 due to increased interest income from the funds raised in the Companys May 2007 financing. Other income for the six months ended June 30, 2007 decreased by $3.1 million from the comparable period in 2006 primarily due to a significant non-recurring gain on sale of marketable securities in 2006. Total expense for the three and six months ended June 30, 2007 increased by $0.6 and $1.7 million, respectively over the comparable periods in 2006. The change was primarily due to an increase in employee compensation as a result of new hires and stock option compensation expense, as well as fees related to the Brisas project financing, partially offset by foreign currency gain.
Selected Quarterly Financial Data (Unaudited) |
The quarterly results shown below generally reflect the increasing costs associated with the development and financing of Brisas including personnel costs, investor relations and consultant fees. The increase in Other Income and Net Income in the quarter ended 03/31/06 was a result of a one time gain from the sale of investments. Fluctuations in Other Income over the quarters presented generally represent the impact of changes in levels of invested cash. Increase in Net Loss for the quarter ended 12/31/06 is primarily attributable to an increase in foreign currency loss.
(Unaudited) | ||||||||||||||||
Quarter ended | 06/30/07 | 03/31/07 | 12/31/06 | 09/30/06 | 06/30/06 | 03/31/06 | 12/31/05 | 09/30/05 | ||||||||
|
|
|
|
|
|
|
|
|
||||||||
Other Income | $1,894,117 | $673,124 | $1,417,955 | $1,119,412 | $888,611 | $ 4,826,080 | $ 429,656 | $ 395,410 | ||||||||
Net income (loss) | ||||||||||||||||
before tax | (1,252,054) | (2,871,675) | (4,873,662) | (2,317,115) | (1,610,458) | 2,346,293 | (3,343,377) | (1,755,640) | ||||||||
Per share | (0.03) | (0.07) | (0.13) | (0.06) | (0.04) | 0.07 | (0.10) | (0.05) | ||||||||
Diluted | (0.03) | (0.07) | (0.13) | (0.06) | (0.04) | 0.07 | (0.10) | (0.05) | ||||||||
Net income (loss) | (1,254,600) | (2,874,969) | (5,057,977) | (2,501,572) | (1,716,975) | 2,299,779 | (3,344,848) | (1,755,640) | ||||||||
Per share | (0.03) | (0.07) | (0.13) | (0.06) | (0.05) | 0.06 | (0.10) | (0.05) | ||||||||
Diluted | (0.03) | (0.07) | (0.13) | (0.06) | (0.05) | 0.06 | (0.10) | (0.05) |
Liquidity and Capital Resources |
Our significant investing activities during the three and six months ended June 30, 2007 included the sale of marketable securities, on a net basis, of approximately $0.7 and $1.1 million, respectively and the purchase of property, plant and equipment of approximately $11.7 and $14.3 million, respectively. Capitalized development costs incurred on Brisas represent the majority of the amount invested in property, plant and equipment.
Our total financial resources, which include cash plus marketable securities, increased approximately $158 million from December 31, 2006 to approximately $187 million as of June 30, 2007.
Page 8
As of August 14, 2007, we had the following shares, equity units and share purchase options issued:
Class A common shares | 54,616,694 | |
Equity units 1 | 1,085,099 | |
Class A common share purchase options 2 | 2,461,139 | |
|
|
1) | An equity unit consists of one class B common share of Gold Reserve Inc. and one class B common share of Gold Reserve Corporation. Equity units are convertible into Class A common shares of Gold Reserve Inc. on a one-to-one basis. |
2) | Exercisable at between $0.69 and $5.45 per share. |
In May 2007 we completed the sale of $103,500,000 aggregate principal amount of 5.50% Senior Subordinated Convertible Notes due 2022 and 13,762,300 Class A common shares at $5.80 per share (Cdn$6.42 per share) for net proceeds to the Company of approximately $173,000,000 after deducting underwriting fees and offering expenses. Accounting standards require the Company to allocate the notes between their equity and debt component parts based on their respective fair values at the time of issuance. The equity portion of the notes was estimated using the residual value method at approximately $29 million net of issuance costs. The fair value of the debt component is accreted to the face value of the notes using the effective interest method over the term of the notes, with the resulting charge recorded as interest expense which has been capitalized.
In late 2006, we appointed Corporación Andina de Fomento (CAF), Export Development Canada (EDC), UniCredit Group (HVB) and WestLB AG (WestLB) of Germany as Mandated Lead Arrangers (MLAs) to arrange up to US$425 million of project debt for Brisas. Legal, technical and environmental due diligence is on-going. Any future funding is, among other things, subject to satisfactory due diligence findings, final credit committee approval and other conditions precedent.
Our efforts are focused on obtaining the required permits or authorizations required for development of Brisas, obtaining suitable funding, completing detailed project engineering, completing project related contracts such as port facilities, concentrate sales contracts, electricity and fuel supply contracts and completing other agreements related to the construction and operation of Brisas. Initial capital expenditures required to put Brisas into production as presently proposed by us is estimated, as of April 2006, to be approximately $638 million. As a result of the passage of time, increases in the cost of raw materials and changes in supply and demand dynamics within the industry, we expect this initial capital cost estimate to increase 10% to 15% prior to the placement of firm orders. Actual costs will not be known until firm orders are placed with suppliers in the coming months.
As of August 14, 2007 we held approximately $182 million in cash and investments. In the near-term, we believe that cash and investment balances are sufficient to enable us to fund early works construction through 2008 (excluding substantial Brisas construction activities). The timing and extent of additional funding or project financing, if any, depends on a number of important factors, including, but not limited to the actual timetable of our future work plans, our assessment of the financial markets, the political, regulatory and economic conditions in Venezuela, our share price and the price of gold and copper. We provide no assurances that we will be able to obtain the substantial additional financing that will be needed to construct Brisas. Failure to raise the required funds will mean we will be unable to construct and operate Brisas.
Contractual Obligations |
The following table sets forth information on the Companys material contractual obligation payments for the periods indicated as of June 30, 2007:
Payments due by Period |
Less than | More Than | |||||||||
Contractual Obligations | Total | 1 Year | 1-3 Years | 4-5 Years | 5 Years | |||||
|
|
|
|
|
|
|||||
Equipment contracts1 | $ 67,359,764 | $ 25,679,788 | $ 41,679,976 | |||||||
EP & CM Contractor2 | 33,000,000 | 15,000,000 | 18,000,000 | |||||||
Mandated Lender Group3 | 160,000 | 160,000 | ||||||||
Operating Lease4 | 204,040 | 122,424 | 81,616 | |||||||
|
|
|
|
|
|
|||||
Total | $ 100,723,804 | $ 40,962,212 | $ 59,761,592 | |||||||
|
|
|
|
|
|
1 | The Company has placed orders for the fabrication of processing equipment and for Caterpillar equipment and has made deposits on this equipment of $7.5 million. |
2 | The amounts shown above are conditional upon obtaining sufficient project financing and on-going project approvals for Brisas. The Company maintains EP & CM services contracts under which the Company is expected to pay as much as $33 million during the next three years. In general the contract is cancellable as a result of various events or reasons and upon cancellation the Company is obligated to pay contractor costs already incurred, any third party commitments, plus any de-mobilization charges that might be applicable. |
3 | The Company has a services agreement with a group of Mandated Lenders to provide various banking services related to obtaining project financing for Brisas. The agreement provides for quarterly payments to each of the four banks in the Mandated Lenders group until the financing is secured. The amount shown above represents the amount payable under the contract if financing is not secured during 2007 and the contract is not cancelled by the Company. The agreement is cancellable at anytime with no further obligation of the Company. |
4 | The Company leases office space under a non-cancelable operating lease which expires March 1, 2009. |
Page 9
Transactions with Related Parties |
MGC Ventures. The Chief Executive Officer, President, Vice President-Finance and Vice President-Administration of the Company are also officers and/or directors and shareholders of MGC Ventures. The Company owned 12,062,953 common shares of MGC Ventures at June 30, 2007 and December 31, 2006 which represented 46% of its outstanding shares. MGC Ventures owned 258,083 common shares of the Company at June 30, 2007 and December 31, 2006. In addition, MGC Ventures owned 280,000 common shares of Great Basin at June 30, 2007 and December 31, 2006. During the last three years, the Company sublet a portion of its office space to MGC Ventures for $6,000 per year.
Great Basin. The Chief Executive Officer, President, Vice President-Finance and Vice President-Administration of the Company are also officers and/or directors and shareholders of Great Basin. The Company owned 15,661,595 common shares of Great Basin at June 30, 2007 and December 31, 2006, which represented 46% of its outstanding shares. Great Basin owned 491,192 common shares of the Company at June 30, 2007 and December 31, 2006. Great Basin also owned 170,800 common shares of MGC Ventures at June 30, 2007 and December 31, 2006. During the last three years, the Company sublet a portion of its office space to Great Basin for $6,000 per year.
Page 10
CONSOLIDATED BALANCE SHEETS | ||||||
June 30, 2007 (unaudited) and December 31, 2006 | ||||||
U.S. Dollars | 2007 | 2006 | ||||
|
|
|
|
|||
ASSETS | ||||||
Current Assets | ||||||
Cash and cash equivalents | $ 181,093,650 | $ 25,374,688 | ||||
Marketable securities (Note 7) | 5,913,117 | 3,309,622 | ||||
Deposits, advances and other | 708,572 | 515,396 | ||||
|
|
|
|
|||
Total current assets | 187,715,339 | 29,199,706 | ||||
Property, plant and equipment, net | 90,377,383 | 73,643,895 | ||||
Other | 1,960,637 | 1,772,120 | ||||
|
|
|
|
|||
Total assets | $ 280,053,359 | $ 104,615,721 | ||||
|
|
|
||||
LIABILITIES | ||||||
Current Liabilities: | ||||||
Accounts payable and accrued expenses | $ 3,698,684 | $ 1,914,633 | ||||
Accrued interest | 670,270 | | ||||
Future income tax | 311,851 | | ||||
|
|
|
|
|||
Total current liabilities | 4,680,805 | 1,914,633 | ||||
Convertible notes (Note 5) | 69,781,806 | | ||||
Minority interest in consolidated subsidiaries | 1,743,046 | 1,729,076 | ||||
|
|
|
|
|||
Total liabilities | 76,205,657 | 3,643,709 | ||||
|
|
|
|
|||
SHAREHOLDERS' EQUITY | ||||||
Serial preferred stock, without par value, none issued | | | ||||
Common shares and equity units, without par value (Note 4) | 242,306,241 | 167,463,742 | ||||
Equity component of convertible notes (Note 5) | 28,770,426 | | ||||
Less common shares held by affiliates | (636,267) | (636,267) | ||||
Stock options | 4,262,314 | 3,105,169 | ||||
Accumulated deficit | (73,089,330) | (68,959,761) | ||||
Accumulated other comprehensive income (Note 6) | 2,235,189 | | ||||
KSOP debt | (871) | (871) | ||||
|
|
|
|
|||
Total shareholders' equity | 203,847,702 | 100,972,012 | ||||
|
|
|
|
|||
Total liabilities and shareholders' equity | $ 280,053,359 | $ 104,615,721 | ||||
|
|
|
||||
The accompanying notes are an integral part of the consolidated financial statements. | ||||||
Approved by the Board of Directors: | ||||||
s/ Chris D. Mikkelsen | s/ Patrick D. McChesney |
Page 11
CONSOLIDATED STATEMENTS OF OPERATIONS
For the Three and Six Months Ended June 30, 2007 and 2006 (unaudited) | ||||||||
Three Months Ended | Six Months Ended | |||||||
U.S. Dollars | 2007 | 2006 | 2007 | 2006 | ||||
|
|
|
|
| ||||
OTHER INCOME | ||||||||
Interest | $ 1,168,612 | $ 299,976 | $ 1,376,188 | $ 499,605 | ||||
Gain on sale of marketable securities | 725,505 | 588,635 | 1,191,053 | 5,215,086 | ||||
|
|
|
|
| ||||
1,894,117 | 888,611 | 2,567,241 | 5,714,691 | |||||
EXPENSES | ||||||||
General and administrative | 2,511,445 | 943,781 | 4,664,768 | 2,065,964 | ||||
Technical services | 1,481,178 | 1,172,441 | 2,824,695 | 2,080,754 | ||||
Corporate communications | 274,893 | 181,746 | 391,892 | 331,546 | ||||
Legal and accounting | 142,879 | 87,392 | 196,355 | 340,524 | ||||
Foreign currency (gain) loss | (1,268,214) | 18,032 | (1,400,710) | 83,368 | ||||
Minority interest in net income | ||||||||
of consolidated subsidiaries | 3,990 | 95,677 | 13,970 | 76,700 | ||||
|
|
|
|
| ||||
3,146,171 | 2,499,069 | 6,690,970 | 4,978,856 | |||||
|
|
|
|
| ||||
Net income (loss) before tax | $ (1,252,054) | $ (1,610,458) | $ (4,123,729) | $ 735,835 | ||||
Income tax | 2,546 | 106,517 | 5,840 | 153,031 | ||||
|
|
|
|
| ||||
Net income (loss) | $ (1,254,600) | $ (1,716,975) | $ (4,129,569) | $ 582,804 | ||||
|
|
|
|
| ||||
Net income (loss) per share, basic and diluted | $ (0.03) | $ (0.05) | $ (0.09) | $ 0.02 | ||||
|
|
|
|
| ||||
Weighted average common | ||||||||
shares outstanding | 47,491,536 | 37,432,484 | 44,257,841 | 36,521,825 | ||||
|
|
|
|
| ||||
The accompanying notes are an integral part of the consolidated financial statements. |
Page 12
CONSOLIDATED STATEMENTS OF DEFICIT | ||
For the Six Months Ended June 30, 2007 and 2006 (unaudited) | ||
U.S. Dollars | ||
|
| |
Deficit, December 31, 2006 | $ (68,959,761) | |
Net loss for the period | (4,129,569) | |
|
| |
Deficit, June 30, 2007 | $ (73,089,330) | |
|
| |
Deficit, December 31, 2005 | $ (61,983,016) | |
Net income for the period | 582,804 | |
|
| |
Deficit, June 30, 2006 | $ (61,400,212) | |
|
|
CONSOLIDATED STATEMENT OF COMPREHENSIVE LOSS
For the Three and Six Months Ended June 30, 2007 (unaudited)
U.S. Dollars | Three Months | Six Months | ||
|
|
| ||
Net loss | $ (1,254,600) | $ (4,129,569) | ||
Other comprehensive income, net of tax: | ||||
Unrealized holding gain arising during period (Note 6) | 568,094 | 209,482 | ||
|
|
| ||
Other comprehensive income | 568,094 | 209,482 | ||
|
|
| ||
Total comprehensive loss | $ (686,506) | $ (3,920,087) | ||
|
|
| ||
The accompanying notes are an integral part of the consolidated financial statements. |
Page 13
CONSOLIDATED STATEMENTS OF CASH FLOWS
For the Three and Six Months Ended June 30, 2007 and 2006 (unaudited) | ||||||||
Three Months Ended | Six Months Ended | |||||||
U.S. Dollars | 2007 | 2006 | 2007 | 2006 | ||||
|
|
|
|
| ||||
Cash Flows from Operating Activities: | ||||||||
Net income (loss) | $(1,254,600) | $(1,716,975) | $(4,129,569) | $ 582,804 | ||||
Adjustments to reconcile net income (loss) to net cash | ||||||||
used by operating activities: | ||||||||
Stock option compensation | 517,078 | 77,968 | 1,318,871 | 271,893 | ||||
Depreciation | 41,895 | 34,875 | 86,924 | 62,916 | ||||
Foreign currency loss | | 18,032 | | 83,368 | ||||
Minority interest in net income (loss) of | ||||||||
consolidated subsidiaries | 3,990 | 95,677 | 13,970 | 76,700 | ||||
Net gain on sale of marketable securities | (725,505) | (588,635) | (1,191,053) | (5,215,086) | ||||
Shares issued for compensation | 202,005 | 10,770 | 357,536 | 102,520 | ||||
Changes in non-cash working capital: | ||||||||
Net increase in deposits | ||||||||
and advances | (38,683) | (996,867) | (193,176) | (1,211,542) | ||||
Net increase (decrease) in accounts payable | ||||||||
and accrued expenses | 763,186 | (999,408) | 102,713 | 46,356 | ||||
|
|
|
|
| ||||
Net cash used by operating activities | (490,634) | (4,064,563) | (3,633,784) | (5,200,071) | ||||
|
|
|
|
| ||||
Cash Flows from Investing Activities: | ||||||||
Proceeds from the sale and maturity of | ||||||||
marketable securities | 1,725,505 | 2,137,868 | 2,691,053 | 8,297,593 | ||||
Purchase of marketable securities | (1,028,439) | (2,266,650) | (1,556,455) | (3,733,959) | ||||
Purchase of property, plant and equipment | (11,741,288) | (3,450,641) | (14,346,639) | (7,173,158) | ||||
Other | (87,461) | (215,552) | (188,517) | (164,109) | ||||
|
|
|
|
| ||||
Net cash used by investing activities | (11,131,683) | (3,794,975) | (13,400,558) | (2,773,633) | ||||
|
|
|
|
| ||||
Cash Flows from Financing Activities: | ||||||||
Net proceeds from the issuance of common shares | 74,250,410 | 24,983,944 | 74,323,237 | 25,080,777 | ||||
Net proceeds from the issuance of convertible notes | 98,430,067 | | 98,430,067 | | ||||
|
|
|
|
| ||||
Net cash provided by financing activities | 172,680,477 | 24,983,944 | 172,753,304 | 25,080,777 | ||||
|
|
|
|
| ||||
Change in Cash and Cash Equivalents: | ||||||||
Net increase in cash and cash equivalents | 161,058,160 | 17,124,406 | 155,718,962 | 17,107,073 | ||||
Cash and cash equivalents - beginning of period | 20,035,490 | 19,352,919 | 25,374,688 | 19,370,252 | ||||
|
|
|
|
| ||||
Cash and cash equivalents - end of period | $181,093,650 | $ 36,477,325 | $ 181,093,650 | $ 36,477,325 | ||||
|
|
|
|
| ||||
The accompanying notes are an integral part of the consolidated financial statements. |
Page 14
Selected Notes To Consolidated Financial Statements
For the Six Months Ended June 30, 2007 and 2006 (unaudited)
Expressed in U.S. Dollars
1. Basis of Presentation
The accompanying unaudited consolidated interim financial statements have been prepared in accordance with accounting principles generally accepted in Canada for interim financial information. Accordingly, they do not include all of the information and footnotes required by accounting principles generally accepted in Canada for complete financial statements.
In our opinion, the accompanying unaudited consolidated financial statements contain all adjustments necessary to present fairly the financial position of Gold Reserve Inc. and subsidiaries (the Company, we, us, or our) as of June 30, 2007, and the results of operations and the cash flows for the three and six months ended June 30, 2007 and 2006. The results of operations for the six months ended June 30, 2007 and 2006 are not necessarily indicative of the results to be expected for the full year.
These financial statements follow the same accounting policies and methods of their application as the most recent consolidated annual audited financial statements, with the exception of the changes in Note 6, and should be read in conjunction with the consolidated financial statements including notes thereto included in the our 2006 annual report.
2. Geographic Segments
Net Income (Loss) for the Three and Six Months Ended June 30, 2007 and 2006
Three Months Ended | Six Months Ended | |||||||
2007 | 2006 | 2007 | 2006 | |||||
|
|
|
|
| ||||
North America | $ (137,365) | $ (695,973) | $ (1,977,201) | $ 2,331,618 | ||||
South America | (1,117,235) | (1,021,002) | (2,152,368) | (1,748,814) | ||||
|
|
|
|
| ||||
Consolidated | $(1,254,600) | $(1,716,975) | $ (4,129,569) | $ 582,804 | ||||
|
|
|
|
|
Page 15
Selected Notes To Consolidated Financial Statements
For the Six Months Ended June 30, 2007 and 2006 (unaudited)
Expressed in U.S. Dollars
3. Share Option Plan
Our Equity Incentive Plan (the Plan) allows for the granting of common share purchase options to officers, directors and key individuals for terms of up to ten years. The vesting period of options ranges from immediately to up to three years. There were 774,127 options remaining for future grants at June 30, 2007. Share option transactions for the six months ended June 30, 2007 and 2006 are as follows:
2007 | 2006 | |||||||
|
| |||||||
Weighted | Weighted | |||||||
Average | Average | |||||||
Exercise | Exercise | |||||||
Shares | Price | Shares | Price | |||||
|
|
|
|
| ||||
Options outstanding at beginning of period | 2,662,716 | $3.36 | 3,148,844 | $ 1.36 | ||||
Options exercised | (168,577) | 1.83 | (244,477) | 0.97 | ||||
Options canceled | (33,334) | 1.78 | (14,333) | 2.43 | ||||
Options granted | 20,000 | 5.45 | | | ||||
|
|
|
|
| ||||
Options outstanding at end of period | 2,480,805 | 3.50 | 2,890,034 | 1.39 | ||||
|
|
|
|
| ||||
Options exercisable at end of period | 1,600,310 | $2.98 | 2,486,154 | $ 1.28 | ||||
|
|
|
|
| ||||
Price | Price | |||||||
Range | Range | |||||||
|
|
| ||||||
Exercise price at end of period | $0.69 - $ 5.45 | $ 0.57 - $ 4.14 | ||||||
Exercise price for exercisable shares | $0.69 - $ 5.36 | $ 0.57 - $ 4.14 |
We recorded additional compensation expense of $1,318,871 and $271,893 respectively for stock options vested during the six months ended June 30, 2007 and 2006. The fair value of the options granted in 2007 was calculated using the Black-Scholes model assuming a weighted average risk free interest rate of 4.94%, expected life of three years, expected volatility of 84% and a dividend yield of $ nil. Option pricing models require the input of highly subjective assumptions including the expected price volatility. Changes in the subjective input assumptions can materially affect the fair value estimate, and therefore the existing models do not necessarily provide a reliable single measure of the fair value of the Companys stock options granted during the period. During 2006, the shareholders approved extending the expiration date of 1,755,250 options from June 8, 2006 to December 31, 2006. P>
4. Common Stock |
In May 2007, the Company closed a public offering of 13,762,300 Class A common shares of the Company, representing aggregate net proceeds to the Company of approximately $74 million. In addition, during the six months ended June 30, 2007, the Company issued 168,577 shares for $308,106 upon exercise of stock options and 70,750 shares valued at $357,536 were issued as compensation.
In May 2006, the Company closed a public offering of 3,335,000 Class A common shares of the Company, representing aggregate net proceeds to the Company of approximately $24.6 million. In addition, during the six months ended June 30, 2006, the Company issued 244,477 shares for $237,269 upon exercise of stock options and 25,000 shares valued at $102,520 were issued as compensation.
Page 16
Selected Notes To Consolidated Financial Statements
For the Six Months Ended June 30, 2007 and 2006 (unaudited)
Expressed in U.S. Dollars
5. Convertible Notes
In May 2007, the Company issued $103,500,000 aggregate principal amount of its 5.50% Senior subordinated convertible notes. The notes are unsecured, pay interest semi-annually and will mature on June 15, 2022. The notes are convertible into Class A common shares of the Company at the initial conversion rate, subject to adjustment, of 132.626 shares per $1,000 principal amount (equivalent to a conversion price of $7.54) . Upon conversion, the Company will have the option to deliver common shares, cash or a combination of common shares and cash for the notes surrendered. Accounting standards require the Company to allocate the notes between their equity and debt component parts based on their respective fair values at the time of issuance. The equity portion of the notes was estimated using the residual value method at approximately $29 million net of issuance costs. The fair value of the debt component is accreted to the face value of the notes using the effective interest method over the term of the notes, with the resulting charge recorded as interest expense. Interest expense allocable to the cost of developing mining properties and to constructing new facilities is capitalized until assets are ready for their intended use.
6. New Accounting Standards |
Effective January 1, 2007, the Company adopted CICA Section 3855, Financial Instruments Recognition and Measurement. This section establishes standards for determining when a financial asset, financial liability or non-financial derivative is to be recognized on the balance sheet and whether it will be measured using a cost-based or fair value method. As of January 1, 2007, our investments in marketable securities have been classified as available-for-sale and are recorded at fair value on the balance sheet. Fair values are determined by reference to published price quotations in active markets and changes in these fair values are reflected in other comprehensive income and included in shareholders equity. Our convertible notes are recorded at amortized cost. Transaction costs incurred to issue the notes are deducted from the underlying balance.
We also adopted CICA section 1530, Comprehensive Income effective January 1, 2007. This section requires the presentation of a statement of comprehensive income and its components. Comprehensive income includes net income or loss and other comprehensive income. Other comprehensive income may include holding gains and losses on available-for-sale securities, gains and losses on certain derivative instruments and foreign currency gains and losses from self sustaining foreign operations.
Page 17
Selected Notes To Consolidated Financial Statements
For the Six Months Ended June 30, 2007 and 2006 (unaudited)
Expressed in U.S. Dollars
6. New Accounting Standards, continued
As of January 1, 2007, the effect on our balance sheet of adopting these standards is summarized below. As prescribed by these standards, prior periods have not been restated.
January 1, | ||||||
Adjustment on | 2007 | |||||
December 31, 2006 | Adoption of | Opening | ||||
U.S. Dollars | as Reported | New Standards | Balance | |||
|
|
|
| |||
ASSETS | ||||||
Current Assets | ||||||
Cash and cash equivalents | $ 25,374,688 | $ 25,374,688 | ||||
Marketable securities | 3,309,622 | 2,334,240A | 5,643,862 | |||
Deposits, advances and other | 515,396 | 515,396 | ||||
|
|
|
| |||
Total current assets | 29,199,706 | 2,334,240 | 31,533,946 | |||
Property, plant and equipment, net | 73,643,895 | 73,643,895 | ||||
Other | 1,772,120 | 1,772,120 | ||||
|
|
|
| |||
Total assets | $ 104,615,721 | 2,334,240 | $ 106,949,961 | |||
|
|
|
| |||
LIABILITIES | ||||||
Current Liabilities: | ||||||
Accounts payable and accrued expenses | $ 1,914,633 | $ 1,914,633 | ||||
Future income tax | - | 308,533B | 308,533 | |||
|
|
|
| |||
Total current liabilities | 1,914,633 | 308,533 | 2,223,166 | |||
Minority interest in consolidated subsidiaries | 1,729,076 | 1,729,076 | ||||
|
|
|
| |||
Total liabilities | 3,643,709 | 308,533 | 3,952,242 | |||
|
|
|
| |||
SHAREHOLDERS' EQUITY | ||||||
Serial preferred stock, without par value, none issued | ||||||
Common shares and equity units, without par value | 167,463,742 | 167,463,742 | ||||
Less common shares held by affiliates | (636,267) | (636,267) | ||||
Stock options | 3,105,169 | 3,105,169 | ||||
Accumulated deficit | (68,959,761) | (68,959,761) | ||||
Accumulated other comprehensive income | - | 2,025,707C | 2,025,707 | |||
KSOP debt | (871) | (871) | ||||
|
|
|
| |||
Total shareholders' equity | 100,972,012 | 2,025,707 | 102,997,719 | |||
|
|
|
| |||
Total liabilities and shareholders' equity | $ 104,615,721 | 2,334,240 | $ 106,949,961 | |||
|
|
|
|
A Investments in marketable securities previously accounted for at cost are designated as available-for-sale and carried at fair value.
B The tax effect of the adjustment to marketable securities is recorded as a future tax liability.
C The adjustment to marketable securities, net of future tax is recorded as accumulated other comprehensive income.
Page 18
Selected Notes To Consolidated Financial Statements
For the Six Months Ended June 30, 2007 and 2006 (unaudited)
Expressed in U.S. Dollars
6. New Accounting Standards, continued
Our accumulated other comprehensive income consists of unrealized gains on available-for-sale securities, net of tax. Following is a summary of the changes in accumulated other comprehensive income since the adoption of the new accounting standard on January 1, 2007.
Accumulated Other Comprehensive Income | ||||
|
|
| ||
Opening balance on adoption of new accounting standard, January 1, 2007 | $ 2,025,707 | |||
Other comprehensive income during the period | 209,482 | |||
|
|
| ||
Accumulated Other Comprehensive Income at June 30, 2007 | $ 2,235,189 | |||
|
|
| ||
7. Marketable Securities | ||||
Quoted | ||||
Cost | Market Value | |||
|
|
| ||
June 30, 2007 | ||||
|
|
| ||
Available-for sale securities | $ 3,366,077 | $ 5,913,117 | ||
|
|
| ||
December 31, 2006 | ||||
|
|
| ||
Equity Securities | $ 3,309,622 | $ 5,643,862 | ||
|
|
|
At December 31, 2006, the Companys marketable securities consisted of investments in equity securities which were carried at cost. Effective January 1, 2007, with the adoption of the new accounting standard related to financial instruments (see note 6), the companys marketable securities have been classified as available-for-sale and are recorded at quoted market value.
8. Commitments |
In June 2007 we placed a $64 million order for the fabrication of the Brisas gyratory crusher, pebble crushers, Semi Autogenous Grinding (SAG) and ball mills and other processing equipment from Metso Minerals. As of June 30, 2007 we have made a deposit on this order of $6.4 million
Also in June 2007, we finalized negotiations with Caterpillar Inc. and its local Venezuelan dealer, Venequip S.A., to provide Caterpillar haulage equipment, front end loaders and construction machinery for the construction and operation of Brisas. Our initial order for Caterpillar equipment was approximately $10.7 million of which $1.1 million has been paid as of June 30, 2007.
Page 19
EXHIBIT 99.2 |
Chief Executive Officers Certification of Interim Filings
Page 20
Date: | August 14 , 2007 | |
I, Rockne J. Timm, Chief Executive Officer, Gold Reserve Inc., certify that: |
1. | I have reviewed the interim filings (as this term is defined in Multilateral Instrument 52-109 Certification of Disclosure in Issuers Annual and Interim Filings) of Gold Reserve Inc., (the issuer) for the interim period ending June 30, 2007; | |
2. | Based on my knowledge, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings; | |
3. | Based on my knowledge, the interim financial statements together with the other financial information included in the interim filings fairly present in all material respects the financial condition, results of operations and cash flows of the issuer, as of the date and for the periods presented in the interim filings; | |
4. | The issuers other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures and internal control over financial reporting for the issuer, and we have: | |
a. | designed such disclosure controls and procedures, or caused them to be designed under our supervision, to provide reasonable assurance that material information relating to the issuer, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which the interim filings are being prepared; and | |
b. | designed such internal control over financial reporting, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuers GAAP; and | |
5. | I have caused the issuer to disclose in the interim MD&A any change in the issuers internal control over financial reporting that occurred during the issuers most recent interim period that has materially affected, or is reasonably likely to materially affect, the issuers internal control over financial reporting. | |
Signature: s/Rockne J. Timm Rockne J. Timm Chief Executive Officer |
Page 21
EXHIBIT 99.3 |
Chief Financial Officers Certification of Interim Filings
Page 22
Date: | August 14 , 2007 | |
I, Robert A. McGuinness, Chief Financial Officer, Gold Reserve Inc., certify that: |
1. | I have reviewed the interim filings (as this term is defined in Multilateral Instrument 52-109 Certification of Disclosure in Issuers Annual and Interim Filings) of Gold Reserve Inc., (the issuer) for the interim period ending June 30, 2007; | |
2. | Based on my knowledge, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings; | |
3. | Based on my knowledge, the interim financial statements together with the other financial information included in the interim filings fairly present in all material respects the financial condition, results of operations and cash flows of the issuer, as of the date and for the periods presented in the interim filings; | |
4. | The issuers other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures and internal control over financial reporting for the issuer, and we have: | |
a. | designed such disclosure controls and procedures, or caused them to be designed under our supervision, to provide reasonable assurance that material information relating to the issuer, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which the interim filings are being prepared; and | |
b. | designed such internal control over financial reporting, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuers GAAP; and | |
5. | I have caused the issuer to disclose in the interim MD&A any change in the issuers internal control over financial reporting that occurred during the issuers most recent interim period that has materially affected, or is reasonably likely to materially affect, the issuers internal control over financial reporting. | |
Signature: s/Robert A. McGuinness Robert A. McGuinness Chief Financial Officer |
Page 23